HWCSCH4B1 Safe Route to Schools

HWCSCH4B1 Safe Route to Schools

Excelsior Engineering Services provided inspection services as a sub-consultant for the construction of water main, catch basins, traffic lights, hydrants and bump out. During this project Inspected the installation of sidewalk extensions (bus bulbs/bulb-outs) at various locations at existing bus stops in the Bronx, to eliminate mid-roadway bus loading, to improve pedestrian and motor vehicle movement around public transit stops. Project scope includes, but not limited to field survey/inspection; mark-outs; field mapping; measurements and quantities; preparing construction cards and assessments; overseeing contractor’s daily activities; concrete sidewalk and curb construction; concrete testing; pavement resurfacing; utilities relocation; water mains, sewer, drainage; traffic signals; MPT; community outreach; and coordination with NYC agencies, including the NYCDOT Traffic and Lighting Divisions and utilities companies such as Con Edison, phone and cable. Duties involved inspection of major operations involving concrete, water main, sidewalk, curbs and pedestrian ramps; new street lighting, and MPT.

CLIENT: NYC Department of Design and Construction and Construction
PROJECT COST: $7.3M
YEAR COMPLETED: ON- GOING